Project Information

The S.R. 82 Widening project multilanes the existing roadway to six lanes from Ortiz to south of Lee/Colonial Boulevard (C.R. 884) and reconfigures the intersection at Buckingham Road. New traffic signals will be added at the Buckingham Road intersection and at the Forum Boulevard intersection. This project also includes widening the ramps at I-75 and installing new sidewalks, lighting and landscaping. Water, sewer and storm drainage will be replaced along the entire corridor.

As data becomes available, we will share the information with the public on this page.

 

24-inch sewer force main installation along S.R. 82 near The Forum

24-inch sewer force main installation along S.R. 82 near The Forum

 

Aerial photographs of Ortiz Ave to south of Lee/Colonial Boulevard (C.R. 884), (left to right). February 2010

  • Aerial photograph #1 of S.R. 82 Lee Widening ProjectAerial photograph #1 of S.R. 82 Lee Widening Project
  • Aerial photograph #2 of S.R. 82 Lee Widening ProjectAerial photograph #2 of S.R. 82 Lee Widening Project
  • Aerial photograph #3 of S.R. 82 Lee Widening ProjectAerial photograph #3 of S.R. 82 Lee Widening Project
  • Aerial photograph #4 of S.R. 82 Lee Widening ProjectAerial photograph #4 of S.R. 82 Lee Widening Project
  • Aerial photograph #5 of S.R. 82 Lee Widening ProjectAerial photograph #5 of S.R. 82 Lee Widening Project
  • Aerial photograph #6 of S.R. 82 Lee Widening ProjectAerial photograph #6 of S.R. 82 Lee Widening Project
  • Aerial photograph #7 of S.R. 82 Lee Widening ProjectAerial photograph #7 of S.R. 82 Lee Widening Project
  • Aerial photograph #8 of S.R. 82 Lee Widening ProjectAerial photograph #8 of S.R. 82 Lee Widening Project